
Yarn Date: 09.08.09
Encountered dangerously powerful yarn fumes in Paige. Crew eventually escaped but not without casualties.
Damage Report includes: 1 laceweight cardigan pattern with yarn
Estimated time to recovery: determination pending science team reports
Incoming fiber is already integrating into the system, long term affects of the species are not yet determined.
Issues with engineering resulted in two failed cast ons. Further study uncovered lack of processing power at fault. Am assured that new mathematical models will correct the problem.
Shipment of incoming fiber is predicted for this week. Containment procedures are in place and I am cautiosly optimistic to begin processing gift knits.
Total Hours logged this period:
Knit: 14.5
Spin: 2.5
Dye: 3